Bayfancy Residence – 16F Slab completed
Update
4th-September-2025
🏗️ Bayfancy Residence – 16F Slab Completed
📅 4th September 2025
📊 Current Construction Progress:
✅ Completion of 16F slab concrete pouring
✅ Masonry works on the 6F completed
🔁 Ongoing Operations:
⚒️ Reinforcement and formwork installation for the 17F slab in progress
📶 Masonry works on the 7F has been 20% completed
🏗️ Construction Technique: Reinforced Concrete Lintel
🔧 In masonry wall construction for door and window openings, reinforced concrete window lintels are installed to enhance structural strength, prevent cracking, and mitigate water penetration.
✅ Improves structural integrity and prevents corner cracking at openings
✅ Effectively transfers upper loads and enhances seismic resistance
✅ Blocks water infiltration paths and improves waterproof sealing
✅ Provides a level and solid mounting base for door/window installation
💡 Much like a "secure cap and belt" for door and window openings, the window sill beam restrains wall deformation and distributes stress uniformly. It ensures robust installation of every door and window, maintaining high standards of building safety and long-term durability.
🌟 Bayfancy Residence remains steadfast in its mission to "create personalized smart luxury living" meticulously crafting benchmark-quality residences.
👷 Our team is consistently dedicated to refining residential environments and crafting superior lifestyles for our residents.